DIGITAL ELLIPTICAL PRODUCT LABW-44
VIRTUAL POWER PLANT (VPP) AGGREGATION & DER DISPATCH

Dispatch distributed battery fleets in
sub-200ms grid response.

EnergyMesh aggregates commercial battery energy storage systems (BESS), solar inverters, and EV chargers into a unified virtual power plant for wholesale frequency regulation and peak shaving.

View VPP Grid Operations Tower
VPP DISPATCH CONTROLLER (OPENADR 2.0B / IEEE 2030.5)
Dispatch Operating Mode
Wholesale Peak Shaving • Fast BESS Discharge
Market price: $148/MWh • Response latency: 180 ms
Aggregated Active Output
42.5 MW
34 Distributed BESS sites synchronized

BESS Fleet Optimization

Maximize battery cycle life and prevent thermal degradation with intelligent cell balancing and depth-of-discharge constraints.

Fast Frequency Response

Respond to grid under-frequency excursions within 200ms using autonomous edge droop controllers conforming to IEEE 1547.

Wholesale Market Bidding

Automate Day-Ahead and Real-Time CAISO/ERCOT market bid submissions with probabilistic price forecast models.

Virtual Power Plant Infrastructure

EnergyMesh connects utility dispatch centers to distributed energy resources.

1. OpenADR Telemetry Ingest

Receives automated demand response and capacity signals from regional ISO operators.

2. Edge Inverter Control

Commands distributed smart inverters via Modbus SunSpec and DNP3 secure protocols.

3. Revenue Settlement

Calculates capacity payments and energy arbitrage yields per participating BESS asset.

ENGINEERED BY DIGITAL ELLIPTICAL

Ready to engineer your custom energy & cleantech architecture?

Explore our production engineering, fixed-cost delivery, or talent-on-demand models to build mission-critical digital systems.