DIGITAL ELLIPTICAL PRODUCT LABA-44
BESS BATTERY STORAGE & LMP ARBITRAGE WORKBENCH
EnergyMesh Battery Dispatch Studio
Command utility-scale battery energy storage systems, execute wholesale LMP arbitrage, and bid into ancillary frequency markets.
BESS Battery Sites3 SITES
BESS-ERCOT-WEST-01DISCHARGE_PEAK
West Texas Permian BESS (100MW / 400MWh)
SoC: 88%$480/MWh
BESS-CAISO-KERN-02CHARGE_SOLAR_SOAK
Kern County Solar Storage Hub (150MW / 600MWh)
SoC: 42%$–12/MWh
BESS-PJM-NJ-03REGULATION_ACTIVE
New Jersey RegD Fast Frequency Storage (50MW)
SoC: 60%$180/MWh
West Texas Permian BESS (100MW / 400MWh)Power: 100 MW · Current Node LMP: $480/MWh
BESS THERMAL & ARBITRAGE HUD
OpenADR 2.0b telemetry streaming at 240ms latency. Cell temperature balanced at nominal 28.2°C across all liquid-cooled battery racks. Arbitrage yield: +38.4%.
STATE OF CHARGE88% SoC
DISPATCH SPEED240ms Sub-Second Ingest
Interconnect: OpenADR 2.0b CertifiedStatus: DISCHARGE_PEAK
ENGINEERED BY DIGITAL ELLIPTICAL
Ready to engineer your custom energy & utilities ai architecture?
Explore our production engineering, fixed-cost delivery, or talent-on-demand models to build mission-critical digital systems.