PRODUCTION FLOW DEEP DIVE

End-to-end production flow from raw material to finished goods.

A manufacturing ERP needs more than order entry. It must track materials, BOM routing, shop-floor movement, WIP, scrap, rework, assembly, costing, and finished goods across every stage of production.

Raw Material
12,500 kg
BOM Recipe
Section Routing
S1
S2
S3
WIP: 3,150
Scrap: 1.5%
Assembly & FG
1,248 units
Costing Update
Ledger Posted

The Production Lifecycle

Click any stage to view the exact data points, roles, and actions tracked by the ERP at that step.

Inventory Received & QC
Raw Material
Order & BOM Validation
Planning
Store to Shop Floor
Issue
Primary Processing
Injection
Final Combination
Assembly
Ready for Dispatch
FG Transfer
Cost Roll-up
Costing

Automated Order Logic

When a sales order is confirmed, the system automatically checks the Bill of Materials (BOM), validates stock, and creates section-wise routing.

1. Product Selected

Industrial Chair (Blue) x 500 units

2. BOM & Recipe Check

Calculating required raw materials against current stock levels.

3. Stock Reserved

Material locked for production to prevent double-booking.

4. Routing Created

Tasks assigned to Injection, Frame, and Assembly sections.

Material Shortage Exception

If the required raw material is insufficient, the system automatically halts the routing and suggests procurement.

Order StatusON HOLD
Action Auto-PR Generated

System Result

Eliminates manual excel calculations and ensures production only starts when materials are genuinely available.

Section-Wise WIP Tracking

Live tracking of received, processed, and scrap quantities at every individual department.

Raw Material Store

Store In-charge
Cleared
Received12,500 kg
Processed11,200 kg
Scrap 0%
Just now
View Details

Injection Shop

Section Foreman
WIP
Received4,500 kg
Processed4,300 kg
Scrap 2.1%
Just now
View Details

Blow Shop

Section Foreman
Cleared
Received3,200 kg
Processed3,150 kg
Scrap 1.5%
Just now
View Details

Frame Department

Section Foreman
WIP
Received2,000 units
Processed1,850 units
Scrap 0.5%
Just now
View Details

Khurak Shop

Chemical Engineer
Cleared
Received800 liters
Processed800 liters
Scrap 0%
Just now
View Details

Phosphate Shop

Process Supervisor
WIP
Received1,850 units
Processed1,800 units
Scrap 1.2%
Just now
View Details

Powder Coating

Painting Lead
Bottleneck
Received1,800 units
Processed1,500 units
Scrap 3.8%
Just now
View Details

Assembly

Assembly Manager
Running
Received1,500 units
Processed1,248 units
Scrap 0.2%
Just now
View Details
Job List
JD
TODAY'S JOBS (3)
PO-2024-148PENDING
Injection Shop • 4,500 kg req.
OPEN JOB
PO-2024-248PENDING
Injection Shop • 4,500 kg req.
OPEN JOB
PO-2024-348PENDING
Injection Shop • 4,500 kg req.
OPEN JOB

Foreman Mobile Interface

Eliminating paper trails by putting the ERP directly into the hands of shop-floor supervisors. Fast, low-friction, and validated data entry.

Job List

View assigned production orders and section requirements.

Material Received

Log raw materials or WIP transferred from previous sections.

Processing Entry

Input exact processed quantities and identify rejected parts.

Forward Section

Push completed WIP to the next logical department.

Shift Summary

Review daily completions, scrap percentages, and sync status.

Live Bottleneck Detection

Management dashboards instantly identify which section is holding up production based on input vs output variance.

Section-Wise Input vs Output

Input
Output
Injection
4300
2.1% Scp
Blow
3150
1.5% Scp
Frame
1850
0.5% Scp
Phosphate
1800
1.2% Scp
Powder Coating
1500
3.8% Scp
TOTAL WIP SECTIONS
7
Active processing nodes
BOTTLENECK DETECTED
Powder Coating
WIP accumulation: 300 units
COMPLETED TODAY
1,248
Units transferred to FG

Automated Cost Roll-up

Every material issue and processed quantity automatically feeds into the costing ledger, eliminating end-of-month manual calculations.

Material Cost
$42,500.00
Based on FIFO valuation
Labor & Overhead
$12,350.00
Allocated by section time
WIP Valuation
$18,400.00
Current floor value
FG Transferred
$36,450.00
Ready for sales

Variance Analysis

PO-2024-348
Component
Standard
Actual
PP Granules
4,500 kg
4,620 kg
Masterbatch
150 kg
150 kg
Steel Frames
500 pcs
500 pcs
Calculated Unit Cost$72.90
Variance vs Standard ($70.00)+4.14%